CLARK & DIVISION TOWER WITH NEW JEWEL OSCO STORE

Detailed Narrative Description of Project & Services provided :

Design Consulting Engineers (DCE) is selected by Fifield Co. to provide construction inspection and testing
services on the Clark & Division tower (The Sinclair) with the Jewel Osco store Project in Gold Coast Chicago.
The Sinclair tower is a 35-story, 390-unit development that will include a 55,000-square-foot Jewel-Osco grocery
and drugstore at its base. The Sinclair will include one-, two-, three- and even four-bedroom apartments and more
than 55,000 square feet of amenity space and outdoor decks. The building, which will be right next to a CTA
Red Line subway station, will have a pool and spa, fitness club, yoga studio, screening room, demonstration
kitchen and a bicycle storage and repair room.
The tower is post-tensioning concrete structure and DCE will provide post-tensioning system inspection during
the construction phase of this project. DCE will also monitors the post-tensioning strength using Maturity
Method (ASTM C 1074) before stressing of each floor of the tower.

Activities of this Project:
  • Caisson foundation and soil inspection.
  • Building foundation pad inspection and testing.
  • Inspection and testing of soil, foundation, subgrade base and backfill materials.
  • Pre-cast concrete inspection and testing at shop and field.
  • Inspection and testing of massive slab on grade concrete.
  • Review, inspection, and testing of concrete and asphalt paving.
  • Quality control plan monitoring.
  • Masonry and Fireproofing Inspection and Testing.
  • Floor Flatness and Floor Levelness inspection and testing.
  • Preparation of final inspection and testing reports.
  • Submitting daily field inspection and laboratory testing reports to client via e-mail in PDF format.
PROJECT LOCATION:

Clark and Division
Chicago, IL.

CLIENT:

Fifield Co. /James McHugh
Construction

CONSTRCUTION COST:

$230 Millions